Empereur - Befimmo | Befimmo
Befimmo
Contact
Oliver De Wael
Senior Contract Manager
Get in touch
Portrait of Oliver De Wael

Originally built in the 1960s, this icon will be transformed into a high-performance, sustainable workspace.

Total area
6,700 m²
Final delivery
Q4 2027 (estimation)
Composition
Office space, retail space, panoramic terrace
Green roofs
± 769 m²
Panoramic terrace
± 245 m²
Shared courtyard
110 m²
Active mobility
65 secured bicycle parking spots, close to two railway stations.
PEB
Energy class A
EU taxonomy
Fully compliant

Empereur

Empereur

Empereur

Empereur

Empereur

Empereur

Empereur

Empereur

Empereur

Empereur

Perfectly located in the centre of Brussels

Positioned between Brussels’ business and cultural districts, Empereur balances historic charm with visionary efficiency. 

The surrounding area offers a rich mix of shops, hotels, cultural venues, restaurants, bars and parks, all within easy walking distance. Several historic landmarks and major museums are nearby, as well as a wide range of lunch spots and well-known cafés. Situated between Sablon and the Grand Place, Empereur enjoys a central and highly connected location.

Sustainability at the heart

To limit the embodied carbon of the redevelopment, priority was given to preserving most of the structures rather than opting for demolition and reconstruction. 

The building envelope has been designed to minimise the need for heating, cooling and lighting, ensuring optimal comfort while lowering energy consumption.

Empereur is a key part of Brussels’ urban renewal. It is the best proof that redevelopment can honour the past while building for the future.

Total area
Total area
6,700 m²
Renovation date
Renovation date
2024/2027 (estimation)
Composition
Composition
Office space, retail space, panoramic terrace

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

A LANDMARK REBORN

Befimmo

Technicalities

Heat pumps
Solar panels (+/- 65 kWc, covering 10–15% of PEB primary energy needs)
Insulated roof and façades
769 m² of green roofs on the 5th floor
Rainwater recuperation and retention systems
Fossil fuel-free operations
100% PRM accessible